← Main page  /  Guide

What Shapes the Cost of Cabinet Shop Drawings

NOVARS · Updated October 2026 · 5 min read

Shops ask the same first question — what will a set cost? The short answer: it depends on the scope, and the scope is agreed before a single line is drawn. Here is what moves it, so you can read a quote and know what you are paying for.

The three ways drafting gets billed

ModelHow it worksWhat to watch
HourlyYou pay for time spent.The total stays open until the job is done. Ask for a cap.
Per sheetA rate for every sheet issued.Ask how many sheets the job really needs. More sheets doesn't mean more clarity.
Fixed per roomOne figure for the room, agreed up front.Works only if the scope is written down. Read it before you sign.

We quote the third way. A room is a known scope: a run of cabinets, the elevations that describe them, the sections and details the shop needs. A fixed price means you know your cost before the job starts.

What moves the number

Four things, in every drafting office:

  • How much is custom. Stock boxes with a standard reveal take a fraction of the time of face-frame work with inset doors, radius ends or integrated lighting. Every cabinet that departs from standard gets drawn and dimensioned on its own.
  • How much is still open. An appliance model that isn't final, blocking nobody has located, a window wall nobody has measured — each one is a question that has to be carried on the sheets and chased down before issue. We flag them on the sheet instead of guessing, and that coordination is part of the work.
  • How many rooms. A single kitchen carries the whole setup — standards, title sheet, conventions. A kitchen plus laundry plus mudroom shares that setup, so each additional room costs less than the first.
  • How fast. A single-room set takes 2–5 business days once we have your inputs. Rush is available for an added fee.

What you should get for it

A coordinated set, not a stack of pictures: plans, elevations for every run, sections where the construction is not obvious, a finish and hardware schedule, and a sheet index so the bench can find things. Open items written on the drawing in plain language, not buried in an email. The SketchUp model and a DWG export are available on request.

A drafting set is not a cut list or a CNC program. We can add cut lists as a separate line item; CNC programming stays with your shop. When you compare quotes, check whether these are in or out.

How to compare quotes

Ask for the scope in writing: which rooms, which sheets, how many revision rounds, what counts as a change. Ask what happens when an appliance changes after the set is issued. Ask whether the drafter will join the conversation with the designer and client, or stays behind the scenes. Two quotes with the same number can describe very different amounts of work.

If you want a figure for a real room, send what you have — a sketch, a plan, measurements — and we reply within one business day with a scope, a fixed price, a timeline and anything we still need.