← Main page  /  Guide

What Shapes the Cost of Cabinet Shop Drawings

NOVARS · Updated October 2026 · 5 min read

Shops ask the same first question — what will a set cost? The short answer: it depends on the scope, and the scope is agreed before a single line is drawn. Here is what moves it, so you can read a quote and know what you are paying for.

The three ways drafting gets billed

ModelHow it worksWhat to watch
HourlyYou pay for time spent.The total is open-ended — every revision round adds hours, and you learn the real cost at the end.
Per sheetA rate for every sheet issued.Rewards padding the set, not resolving the job. More sheets is not more clarity.
Fixed per roomOne figure for the room, agreed up front.Works only if the scope is written down. Read it before you sign.

We quote the third way. A room is a known scope — a run of cabinets, the elevations that describe them, the sections and details a bench needs — and a fixed figure is where the shop carries the least risk.

What moves the number

Four things, in every drafting office:

  • How much is custom. Stock boxes with a standard reveal take a fraction of the time of face-frame work with inset doors, radius ends or integrated lighting. Every unit that departs from a standard gets drawn and dimensioned on its own.
  • How much is unresolved. An appliance model that is not final, a backing that nobody has decided, a window wall with no survey — each one is a question that has to be carried on the sheets and chased before release. We mark them in orange rather than guessing, and that coordination is part of the work.
  • How many rooms. A single kitchen carries the whole setup — standards, title sheet, conventions. A kitchen plus laundry plus mudroom shares that setup, so each additional room costs less than the first.
  • How fast. A normal single-room set takes a few business days once inputs are in. A rush compresses that, and a rush carries a premium.

What you should get for it

A coordinated set, not a stack of pictures: plans, elevations for every run, sections where the construction is not obvious, a finish and hardware schedule, and a sheet index so the bench can find things. Open questions written on the drawing in plain language, not buried in an email. Native files available if your shop works in SketchUp, AutoCAD or Mozaik.

What a drafting set is not: a cut list, production documentation or a CNC file. Those stay with the shop, and a quote that claims otherwise is quoting something else.

How to compare quotes

Ask for the scope in writing: which rooms, which sheets, how many revision rounds, what counts as a change. Ask what happens when an appliance changes after release. Ask whether the drafter will join the conversation with the designer and client, or stays invisible. Two quotes with the same number can describe very different amounts of work.

If you want a figure for a real room, send what you have — a sketch, a plan, measurements — and we reply within one business day with a scope, a timeline and what is still needed.

Made on
Tilda